Connect with us

Business

8th Pay Commission: How Much Will Central Govt Employees’ Salaries Rise? What We Know So Far

Published

on

8th Pay Commission: How Much Will Central Govt Employees’ Salaries Rise? What We Know So Far


Last Updated:

The government has begun consultations for the 8th CPC to review salaries, pensions, and allowances for central employees and retirees. Suggestions are open until April 30.

8th Pay Commission.

8th Pay Commission.

8th Pay Commission: The government has started the consultation process for the 8th Central Pay Commission, which will review salaries, pensions and allowances for millions of central government employees and retirees.

The Ministry of Finance has invited suggestions from employees, pensioners, staff unions and other stakeholders as part of the exercise. Inputs can be submitted through an online portal until April 30, 2026.

The Terms of Reference for the commission were notified on November 3, 2025, and the panel has been given 18 months to submit its recommendations. Once the report is submitted and approved by the government, it could lead to a revision in pay structures and pension benefits.

The proposed revision is expected to affect around 50 lakh central government employees and nearly 69 lakh pensioners.

What Is The 8th Pay Commission?

Pay commissions are constituted periodically by the government to review the salary structure of central government employees and recommend changes based on inflation, economic conditions and fiscal capacity.

India’s first pay commission was set up in 1946, and since then seven such panels have revised pay and allowances.

Under the 7th Pay Commission, implemented in 2016, the minimum basic salary of central government employees was increased to Rs 18,000 per month, while the maximum basic salary was fixed at Rs 2.5 lakh.

How Salaries Have Changed Over Time

Each pay commission has significantly revised government salaries over the decades.

The 1st Pay Commission (1946-47) fixed the minimum basic salary at Rs 55, while the maximum salary was Rs 2,000.

The 2nd Pay Commission (1957-59) raised the minimum salary to Rs 80, with the maximum reaching Rs 3,000.

The 3rd Pay Commission (1972-73) increased the minimum pay to Rs 196, while the maximum salary was set at Rs 3,500.

The 4th Pay Commission (1986) raised the minimum basic salary to Rs 750 and the maximum to Rs 8,000.

Under the 5th Pay Commission (1996), the minimum salary increased to Rs 2,550, while the maximum rose to Rs 26,000.

The 6th Pay Commission (2006) pushed the minimum basic pay to Rs 7,000, with the maximum salary reaching Rs 80,000.

Finally, the 7th Pay Commission (2016) raised the minimum basic salary to Rs 18,000 and the maximum basic pay to Rs 2.5 lakh.

Will Minimum Salary Rise To Rs 46,000?

There has been speculation that the minimum basic salary could rise significantly under the 8th Pay Commission, depending on the fitment factor used to revise pay.

Some estimates suggest that if the fitment factor is set at a higher level, the minimum basic salary could increase substantially from the current Rs 18,000, potentially crossing Rs 40,000.

However, government officials have clarified that no final decision has been taken on the revised pay levels.

Long Process Before Pay Hike

The government has also said that financial provisions for implementing the new pay structure will only be made after the commission submits its report and the recommendations are approved.

For now, the consultation phase marks the first step in what is expected to be a lengthy process before any changes in salaries or pensions are implemented.

News business economy 8th Pay Commission: How Much Will Central Govt Employees’ Salaries Rise? What We Know So Far
Disclaimer: Comments reflect users’ views, not News18’s. Please keep discussions respectful and constructive. Abusive, defamatory, or illegal comments will be removed. News18 may disable any comment at its discretion. By posting, you agree to our Terms of Use and Privacy Policy.

Read More



Source link

Business

Ganga Expressway inaugurated by PM Modi: UP’s longest expressway between Meerut & Prayagraj; check travel time, route, speed limit – top facts & images – The Times of India

Published

on

Ganga Expressway inaugurated by PM Modi: UP’s longest expressway between Meerut & Prayagraj; check travel time, route, speed limit – top facts & images – The Times of India


Uttar Pradesh has over 60% of India’s total access-controlled expressway network.

Ganga Expressway, the longest expressway so far in Uttar Pradesh, was inaugurated by Prime Minister Narendra Modi on Wednesday. The 594 kilometres long Ganga expressway is a six-lane expressway that aims to reduce the travel time between Meerut and Prayagraj to just 6 hours!Uttar Pradesh has over 60% of India’s total access-controlled expressway network. Recently, Chief Secretary Manoj Kumar pointed out that of the nearly 2,900 km of such highways across the country, close to 1,200 km are located in the state.Meerut District Magistrate and Collector Vijay Kumar Singh on Tuesday said the project has generated tremendous excitement among the public. He noted that the expressway will greatly enhance connectivity to Prayagraj as well as the state capital, Lucknow.Experts say the expressway’s length is particularly significant. According to the Department for Promotion of Industry and Internal Trade, road transport remains economically efficient for freight over distances of up to about 600 km, while rail becomes more viable beyond that point. At 594 km, the Ganga Expressway falls almost exactly within this crucial range for cargo movement.

Ganga Expressway

How will the Ganga Expressway cut down travel time, what districts will it cover, what will be the toll policy, and what cost has it been constructed at? We take a look:

Ganga Expressway: Top Points About UP’s Longest Expressway

Travel time: One of its most noticeable benefits will be the sharp reduction in travel time. The trip between Meerut and Prayagraj, which currently takes around 10 to 12 hours, is likely to be cut to approximately 6 to 7 hours. Access from Delhi: For travellers from the Delhi-NCR region, access will be seamless through the Delhi-Meerut Expressway, followed by a short connecting link at Bijoli to join the Ganga Expressway.

Ganga Expressway: Top facts

Construction cost: Developed at an estimated cost of Rs 36,230 crore, the Ganga Expressway ranks among Uttar Pradesh’s most ambitious infrastructure initiatives. The Ganga Expressway stretches from Bijoli village in Meerut to Judapur Dandu village in Prayagraj.Speed limit: The expressway has been built for speeds of up to 120 kmph. The six-lane access-controlled expressway, has been designed with the provision for expansion to eight lanes.

Ganga Expressway

Route & Districts covered: The expressway will pass through 12 districts: Meerut, Hapur, Bulandshahr, Amroha, Sambhal, Badaun, Shahjahanpur, Hardoi, Unnao, Rae Bareli, Pratapgarh and Prayagraj. In doing so, it will directly influence more than 500 villages along its alignment.Interchanges & amenities: Its connectivity is further strengthened by 21 interchanges that link the corridor with existing national highways and state roads.

Ganga Expressway: Top facts

The project also includes major river crossings, notably a 960-metre bridge over the Ganga and a 720-metre bridge across its tributary, the Ramganga. Both structures have been engineered to suit local flood conditions.To support travellers, the expressway will also feature nine public utility complexes equipped with fuel stations, rest areas and food courts.

Ganga Expressway

Emergency Landing Strip: One of the expressway’s standout features is a 3.5-km emergency landing strip in Shahjahanpur district. Already tested by the Indian Air Force, this airstrip adds a strategic defence dimension to the project, enhancing national preparedness in addition to its economic significance, according to an official statement.Integration with other expressways: Ganga Expressway will eventually be integrated with existing and even upcoming corridors. These include the Agra-Lucknow Expressway, the Farrukhabad Link Expressway, the Jewar Link Expressway, and a proposed extension that will connect Meerut to Haridwar.According to reports, plans are underway to extend the expressway by around 146 kms up to Haridwar. This extension will pass through Amroha and Bijnor and cover more than 200 villages.

Ganga Expressway

Toll: The project will be operated under a toll-based public-private partnership model. Adani Enterprises and IRB Infrastructure Developers have been awarded concession rights for a period of 30 years.For toll collection, two primary toll plazas will be set up at the main entry points in Meerut and Prayagraj. The final toll charges have not yet been announced, however officials have indicated that they are likely to be in line with other expressways in Uttar Pradesh. At present, four-wheelers pay around Rs 2 to Rs 3 per kilometre.



Source link

Continue Reading

Business

Oil prices decline after UAE says it will exit Opec amid Iran war energy crisis

Published

on

Oil prices decline after UAE says it will exit Opec amid Iran war energy crisis


Stocks mostly advanced in Asia on Wednesday despite losses on Wall Street, while oil prices fell after the United Arab Emirates said it would leave Organisation of the Petroleum Exporting Countries (OPEC) in a blow to the powerful oil cartel.

US futures edged higher. Markets in Japan were closed for a holiday.

Elsewhere in Asia, South Korea’s Kospi rose 0.3 per cent to 6,657.40 and the Hang Seng in Hong Kong gained 1.4 per cent to 26,029.02. The Shanghai Composite index traded 0.3 per cent higher at 4,091.01.

Australia’s S&P/ASX 200 slipped 0.3 per cent, to 8,689.50.

Taiwan’s Taiex lost 0.6 per cent, and India‘s Sensex gained 0.4 per cent.

The price of a barrel of Brent crude oil to be delivered in June fell 0.5 per cent to $110.71 early Wednesday. Brent to be delivered in July dropped 0.6 per cent to $103.74. Brent oil was around $70 per barrel before the war began in late February.

Benchmark US crude fell 0.6 per cent to $99.32 a barrel.


Exterior views of Opec (Organization of the Petroleum Exporting Countries) headquarters on 28 April 2026 in Vienna, Austria (Getty)

The UAE’s departure from Opec, due to happen on Friday, has been closely watched by oil markets. Opec accounts for roughly 40 per cent of global oil output, and the UAE is one of Opec’s largest oil producers. It has pushed back against Opec production quotas in recent years, wanting to sell more oil to the rest of the world.

“The UAE’s exit will increase (oil) output,” ING Bank strategists Warren Patterson and Ewa Manthey wrote in a research note on Wednesday. “The UAE has been increasingly frustrated over recent years by its output being constrained by Opec production quotas, which have kept it well below its potential.”

But as US-Iran negotiations for a permanent end to the Iran war stalled and the Strait of Hormuz, where roughly one fifth of the world’s oil passed through before the war, was still largely closed, short term impacts on oil prices will still depend mainly on prospects for reopening the waterway, analysts said.

The UAE was the third largest oil producer within Opec before the Iran war. ING said its departure “will reduce Opec’s effectiveness in managing and influencing the global oil market through supply measures.”

Investors are also awaiting more updates on US-Iran peace talks, although limited progress has been made. Iran has offered to reopen the Strait of Hormuz if the United States lifts its blockade on its ports. So far, the US appears to be ruling out a deal that excludes the Islamic Republic’s nuclear programme.

The Federal Reserve is expected to announce a decision on interest rates later Wednesday.

On Tuesday, Wall Street retreated from its recent record highs. The benchmark S&P 500 fell 0.5 per cent from its latest all-time high to 7,138.80. The Dow Jones Industrial Average edged down 0.1 per cent to 49,141.93, and the technology-heavy Nasdaq composite dropped 0.9 per cent to 24,663.80.

Artificial intelligence-related stocks led the losses. Chip company Broadcom lost 4.4 per cent, Nvidia fell 1.6 per cent and Micron Technology lost 3.9 per cent. Alphabet, Amazon, Microsoft and Meta Platforms are reporting quarterly results on Wednesday.

In other dealings early Wednesday the US dollar rose slightly to 159.63 Japanese yen from 159.62 yen. The euro was trading at $1.1708, down from $1.1712.

The yield on the US 10-year Treasury remained at 4.35 per cent.



Source link

Continue Reading

Business

Maruti profit slips 6.4% in Q4, revenue jumps 29% – The Times of India

Published

on

Maruti profit slips 6.4% in Q4, revenue jumps 29% – The Times of India


New Delhi: Maruti Suzuki had a record year in 2025-26 in terms of revenue and sales, but rising costs took a bite out of profits. The automaker posted consolidated revenue of over Rs 1.8 lakh crore, up 19.9% from the previous year, with total sales of 24.2 lakh vehicles. Net profit, however, barely moved – rising 1.2% to Rs 14,680 crore – as higher material, employee and depreciation costs ate into margins.The March quarter told a similar story: Revenue jumped 28.6% to Rs 52,462 crore, but net profit slipped 6.4% to Rs 3,659 crore.R C Bhargava, chairman, Maruti Suzuki India, said the auto industry is back in a growth phase, helped by stronger consumer demand and govt support, including lower taxes on small cars. He said Maruti expects to roll out about 2.5 lakh more vehicles this year as supply bottlenecks ease and new capacity comes online. The bigger constraint right now, he said, is not whether people want to buy cars but how many the company can actually make. Maruti is adding new production lines that will bring roughly 5 lakh additional units of annual capacity this year.



Source link

Continue Reading

Trending